Thanks to a generous donation the needed landfill has been brought into this
home and the restoration process has begun.
Now that the landfill is in place, a new kitchen and fence need to be
constructed along with a two foot addition to the pre-existing foundation.
| Before - Two feet of water spread across the entire property | ||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| After - It took over 200 truckloads of landfill to raise the property level above the flood plane. | ||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Home
1 of 1